LOGO PRINTING · CUSTOM COLOURS · PACKAGING

Custom Bottles, Tumblers & Mugs

Compare 43 bottle, tumbler, coffee cup and barware series. Choose your product, add a logo and confirm colours and packaging.

Private label · custom development · wholesale projects

Illustrative navy bottle, ivory travel mug and slate-blue handled tumbler, isolated on a transparent background

Business buying options

PL

Private label

Existing-format collections

500

Minimum 500 units

Custom body: 3,000 units

ODM

Original designs

Design, samples & tooling

RFQ

Project planning

Quantity, packing & delivery

BUYING ROUTES

How are you buying?

Build your own collection, source a repeatable range or create a branded programme. Start with the outcome your order needs to deliver.

Manufacturing in Wuyi, Zhejiang

Stormy

A 15,000 m² manufacturing site with equipment for cup production, vacuum processing, spray coating, cap injection moulding and tube necking. Review the factory photographs and document previews alongside the model and sample you intend to order.

About Stormy and our factory · View the production equipment · Review company documents

FINISHED DETAILS

Your brand, in every detail.

The physical finish, complete assembly and pack tell you more than a flat logo preview. Review them together on the version you intend to order.

Blue, sage and ivory drinkware finishes with matching physical color swatches, illustrative concept

Color & branding

Judge your palette, surface and artwork at the intended size and position. Keep the accepted physical reference with the final files.

Tumbler body, clear lid, sealing ring, straw and handle arranged as an illustrative component study

Lids & accessories

Compare how the item opens, carries and cleans. Include the lid, seal, straw and handle in the same sample review.

Blue bottle with a fitted kraft gift box and paper packaging, illustrative concept

Retail & gift packing

Review the contents, box and inserts as one pack, with the labels and carton information needed for the next handling step.

INDUSTRIES WE SERVE

Made for different businesses

A coffee-shop collection, fitness programme and outdoor range need different choices. Explore what matters for your customer and channel.

Unbranded navy bottle beside hiking gear on a stone ledge, illustrative outdoor concept

Outdoor & camping

Carrying comfort, capacity, lid choice and seasonal assortment planning for outdoor businesses.

PROJECT PROCESS

From brief to repeat order

Keep the decisions that affect the product, quotation and delivery connected.

01

Define the order

Start with the intended buyer, a reference and quantities. Identify the features that matter and the choices still open.

02

Review the sample

Choose the sample that answers the next question: model, decoration, development or the finished pack. Record what it represents.

03

Agree the scope

Bring the accepted configuration, files, quantities, checks and commercial assumptions into the same order record.

04

Plan delivery & repeat supply

Review packing, receiving needs and the arrival window. Retain the approved references and identify changes in the next order.

Gloved hand and caliper demonstrating a bottle dimension check, illustrative concept, not test evidence

Agree the checks before you order.

A useful acceptance basis names the product, reference and criteria. Appearance, lid fit and packing concerns need clear descriptions, with findings tied to the item and quantity actually reviewed.

For product reports or market documents, check the identified construction and scope. Company credentials, product testing and order inspection answer different questions.

  • An identified sample and product revision
  • Agreed appearance, assembly and packing checks
  • Supporting records relevant to the actual item

RESOURCES

Guides for better buying.

The buying guides cover the decisions behind a comparable quotation, sample approval and a consistent repeat order.

Compare the complete quotation

Separate variants, decoration, packing and any sample, tooling, testing or transport work so the included scope is clear.

Approve a sample with a purpose

Record what the sample confirms, the changes still needed and the reference that will carry into the order.

Keep the next order consistent

Start from the accepted item code, assembly and files. Review any change in parts, artwork, packing or destination.

Choose your buying programme

Start with the product family, then use the industry route to plan the real purchasing and receiving situation. These are procurement solution guides; final product models and order specifications are confirmed separately.

Water Bottle Sourcing Solutions

Compare private-label, sports, kids, shaker, foldable and functional bottle programmes by recipient, use, customization and sample approval.

Tumbler Sourcing Solutions

Compare stainless, handled, plastic, kids, stacking and press tumblers for retail, coffee, gifting and business merchandise programmes.

Coffee & Specialty Mug Sourcing Solutions

Plan branded coffee mugs, travel mugs, large handled formats and mate gourd programmes for cafés, retail, workplace and gifting buyers.

Barware & Beverage Programme Solutions

Compare wine, champagne, beer, cocktail, shot, can-cooler, chiller and shaker programmes by serving, container fit, branding and pack-out.

Sublimation & Functional Drinkware Solutions

Separate blank supply, finished full-color orders and speaker-tumbler programmes with coating qualification, decoration boundaries and module acceptance.

BEFORE YOU ENQUIRE

A few questions before you start.

Do I need a new mold to add my brand?

An existing format with your logo, color or packing usually follows a different route from a new shape or component. Confirm the selected configuration and decoration process; tooling is assessed separately when the product needs to change.

Can I begin with a photo or a sample?

A reference can begin the discussion while some specifications are still open. Include the intended customer, the features you need, quantities and any required arrival window.

How are minimum quantity and timing confirmed?

They depend on the selected model, variants, decoration, packing and development work. A useful quotation states those assumptions and separates sample approvals, production and transport.

Plan your next drinkware order.

Start with a product reference, quantity plan and intended market or programme. Include any launch or event date so the full project scope can be discussed.